Skip to main content

MINEPDED N°00103/D/MINEPDED/SG/DNC/SDNAV · 07/09/2022

Spill in progress?Response line · +237 655 65 08 48
Collecting a hydrocarbon-contaminated water sample, gloved hands over the basin

Case studies

Four treated cases, four analysis reports

Trials carried out in 2022, including the full-scale tests required by MINEPDED to obtain the approval.

Talk to IMAC

A site to remediate, a batch to treat, a quote to scope?

Describe the contamination, the estimated volume and your timescale, and we will come back with an approach and an order of magnitude.

Response line